So Friday we started by getting our instructions and a list
from Lucas. Our first job was to sort the pots in the tool shed. After deciding
which pots were worth keeping and which one has cracks and chips we signed out
the RTV and brought the pots we are keeping to the hoop house to be organized
and put away. Colin and Lucas spent a good amount of time prepping the back
wall for Monday’s wall building class. We were left with bulb crate full of old
and broken plant tags that needed to be drilled out and fixed so that the
stakes can be re used. We got about half done and it was getting time to clean
up. We helped organize the tractor bay with the other groups and locked up for
the day.
So the final day we began with our sign in and gathering of
needed tools to finish the job we started on Saturday with the hydrangea
pruning, after finishing that up we spent some much needed time perfecting the
jobs completed on Friday, and Saturday as best as the weather conditions would
permit us too. We continued our day with the removal of the snow fences in the
rose garden and removed the metal posts used to place the fence except for one
the ground was still just to frozen to remove it properly. We then did our
cleanup of our work areas as best as possible and the excess debris left over
in the garden beds. The end of the weekend was near we just needed to clean up
and put away our tools and make sure everything is away before finishing our
weekend.
No comments:
Post a Comment